Willand Biogas LLP

This 1.3MW CHP, 600KW Biogas Boiler with 1,000 M3 Biomethane to Grid connection with available 2,500 M3 connection to grid. Using heat for pre treatment hydrolysis provides; Phase 1-Farm based…

Continue Reading Willand Biogas LLP